After the first year of construction, the work is in the structural stage. The basement floors are almost completed with just the tanks and the car park entrance ramps on each floor remaining to be built.
Progress on the tower core and slabs is proceeding as planned with the self-climbing system installed. It is being filled at a rate of two levels per month.
We are continuing with the challenge of finishing the base structure by the start of the season.